Ahh the joys of new construction. Because our lovely hardwood floors were a bit late getting here (after the builder switched vendors), our close date was pushed back to Feb. 17.
Oh well, we just look at it as more time to save some money. Above is a pic of the master bathroom. Today I was in and found out that the sinks are in, water is working, and all the lights and electrical plates are installed and operational.
Still left: trim work in the family room, hanging closet doors, paint touch up, appliances, one more cabinet to install in kitchen (waiting for oven), carpet. I think that's it. I'm sure there's other small things I don't know about, but from what I can see, that's where we're at.