Oh well, we just look at it as more time to save some money. Above is a pic of the master bathroom. Today I was in and found out that the sinks are in, water is working, and all the lights and electrical plates are installed and operational.Still left: trim work in the family room, hanging closet doors, paint touch up, appliances, one more cabinet to install in kitchen (waiting for oven), carpet. I think that's it. I'm sure there's other small things I don't know about, but from what I can see, that's where we're at.
More this weekend.
No comments:
Post a Comment